Hempnall Wind Farm
Enertrag UK - Wind Energy Specialists
 

Scoping Request

Enertrag have submitted a scoping request for an Environmental Impact Assessment to construct a wind farm at Hempnall.

A Scoping Request is an opinion provided by the Council (County, District or Unitary) that indicates what impacts and issues an Environmental Impact Assessment of a proposed development should address.

Downloads

Public Information Handout (0.26Mb)

Copy of Scoping Request (0.27Mb)

Proposed Turbine Locations Plan (0.18Mb)

Non-Technical Summary (0.97Mb)

 

The proposed wind farm on land to the NE of the village of Hempnall would comprise seven turbines each having a maximum output of 3MW. The proposed site layout is shown below. The turbines would generate electricity that would be fed into the national grid via underground cables. Vehicle access routes will be provided between the turbines for construction and maintenance, these will follow current tracks and field boundaries where possible.

Each turbine will be a maximum of 85m high to the hub and the rotors will be a maximum of 90m diameter. The diameter of the tower at the base will be approximately 4m. The final arrangement for the foundation will be confirmed once the turbine manufacture is determined. The land around the turbine will be flat as the foundation would be buried. Once construction is complete, the land can continue to be farmed right up to the turbine tower.

The planning application will describe the turbines in a generic form. The reason for this is that the technology is constantly moving forward and at the time of placing the contract for the turbines Enertrag would want to take advantage of the turbine that best suits the site. The various energy production and greenhouse gas savings are detailed below for a typical seven turbine wind farm:-

Installed capacity
per turbine
Total annual wind farm output (MW/hr)

Equivalent No. households (consumption)

CO 2 Saving (Tonne/Yr)

SO 2 Saving (Tonne/Yr)

NO X Saving (Tonne/Yr)

           

2MW

36,792

7,800

31,641

367

110

2.5MW

45,990

9,750

39,551

458

137

3MW

55,188

11,700

47,461

551

165

These figures are based on:-

30% load factor.

CO2 emission saving of 860g/kWh

SO2 emission saving of 10g/kWh

NO x emission saving of 3g/kWh

and average annual household electricity consumption of 4.7MWh

A brochure containing a map and further information on the proposal is available for download at the top of this page and also here and a copy of the scoping request is also available here.

 
  Your opinion is valuable - we want to hear from you